Vexor Profile Cutterheads/Tooling Ended
Woodworking Machinery Auction - Golden, CO
- Winning Bid : $1,350.00 USD Sold
- 28 Bid(s)
- High Bidder: c****g
Denver Dovetail Drawer Woodworking Machinery Auction- Golden, CO ( Closed #46468327 )
Denver Dovetail Drawer is auctioning machinery no longer required for continuing operations.
-
Item Location
4631 Loveland St. Golden, CO 80403
-
Make
Vexor
-
Model
-
Serial Number
-
Year
2018
-
Phase
-
Voltage
-
Inspection Date
By appointment only, contact Thomas Aronson, [email protected] - 941-699-8717
-
Final Removal Date
April 25th - May 2nd, 2023 (by appointment)
-
Estimated Dimensions
See photos and description
-
Estimated Weight
See photos and description
-
Seller Comment
Buyer responsible for all LTL - UPS Shipping if not a local pickup.
-
Load Fee
-
page views
1916
Vexor Profile Cutterheads/Tooling
- This tooling is for a moulder to produce the stick to match the profiles of the Pillar machine (lot 003) profiles.
- The heads are 5.75 OD by 1.5 ID.
- By simply changing inserts when dull, there is no need to send the tool in for sharpening
-
Extended tool life over brazed tooling due to insert accuracy.
-
Superior carbide (C) and precision wire EDM machined tool bodies (A) result in a superior surface finish and high concentricity.
-
Compression Wedge Gibb (E) requires very little torque to tighten.
- Listed specifications were taken from manufacturer's published information and is assumed to be correct but not guaranteed. Bidder is encouraged to inspect the machine, call with questions or contact the manufacturer for more information.
The listed specifications & information were taken from the manufacturer’s published information, internet research, or seller’s description.
The specifications & information are assumed to be correct; however, in no way, guaranteed. Bidders are encouraged to inspect the machine, call with questions, or contact the manufacturer for more information.
Please log in to view the bid history
Login
Payment is due within 24 hours of auction close. Payments must be made via bank wire transfer for any amount above $1,500. Credit cards may be used up to $1,500 (3% processing fee). Please Contact Sabrina Burns with payment questions at 209-839-7707